10 Marla house construction cost in Sahiwal (2026)
Building a 10 Marla house in Sahiwal in 2026 costs about PKR 1,22,75,790 fully finished, based on current market rates. A 10 Marla plot gives roughly 2,250 sq ft of covered area, typically built as a single-storey home with 5 bedrooms, 5 bathrooms and 1 kitchen, and usually takes 12 to 16 months to complete. Sahiwal offers some of the lowest construction costs of the cities covered on this site. Affordable labour and locally available core materials keep the bill down. The likely range for a fully finished 10 Marla house in Sahiwal is PKR 1,12,08,655 to PKR 1,33,42,924, or about PKR 5,456 per sq ft.
At PKR 5,456 per sq ft, a fully finished 10 Marla house in Sahiwal works out to about PKR 1,22,75,790 in total.
Assumes 5 bedrooms, 5 bathrooms, 1 kitchen and market-grade materials.
Cost of a 10 Marla house in Sahiwal by stage
| Stage | Estimate | Likely range | Per sq ft |
|---|---|---|---|
| Grey structure | PKR 73,03,388 (73 Lakh) | 69.4 Lakh – 76.7 Lakh | PKR 3,246 |
| Semi-finished | PKR 94,91,638 (94.9 Lakh) | 88.3 Lakh – 1.02 Crore | PKR 4,219 |
| Fully finished | PKR 1,22,75,790 (1.23 Crore) | 1.12 Crore – 1.33 Crore | PKR 5,456 |
| Fully finished, double storey | PKR 2,16,93,011 (2.17 Crore) | 1.99 Crore – 2.35 Crore | PKR 4,821 |
Where the money goes (fully finished)
- Grey structurePKR 67,35,874 (55%)
- Boundary wall and gatePKR 6,56,814 (5%)
- Finishing workPKR 48,83,102 (40%)
| Item | Cost | Share |
|---|---|---|
| Steel (Sariya) | 20,15,360 | 16.4% |
| Grey Labour | 15,57,884 | 12.7% |
| Cement | 15,18,100 | 12.4% |
| Bricks (Eent) | 10,78,650 | 8.8% |
| Plumbing | 7,93,125 | 6.5% |
| Electrical | 7,05,000 | 5.7% |
| Wood Doors | 6,84,320 | 5.6% |
| Tiles + Fixing | 6,69,904 | 5.5% |
10 Marla house cost in Sahiwal: 2021 to 2031
| Year | Fully finished cost | Basis |
|---|---|---|
| 2021 | 52.5 Lakh | Market rates |
| 2022 | 71.4 Lakh | Market rates |
| 2023 | 91.4 Lakh | Market rates |
| 2024 | 1.01 Crore | Market rates |
| 2025 | 1.12 Crore | Market rates |
| 2026 | 1.23 Crore | Market rates |
| 2027 | 1.37 Crore | Forecast |
| 2028 | 1.54 Crore | Forecast |
| 2029 | 1.73 Crore | Forecast |
| 2030 | 1.94 Crore | Forecast |
| 2031 | 2.19 Crore | Forecast |
Years marked forecast are projected from recent price growth.
Change the details
Adjust floors, bedrooms, quality or items to see your own number.
Calculating…
—
Building in Sahiwal: local notes
Sahiwal is a smaller market, so material prices can vary more between dealers. Core items such as cement, steel and bricks are available locally, but some finishing materials may need to be sourced from Lahore or Faisalabad.
Labour is the most affordable of the cities covered here, though the pool of highly specialised finishing contractors is smaller than in Lahore.
TODO: add verified information
About a 10 Marla plot
10 marla is a common size for larger family homes. Many owners build a double storey on this plot, which roughly doubles the covered area and the cost.
- Covered area: about 2,250 sq ft
- Typical layout: a single-storey home with 5 bedrooms, 5 bathrooms and 1 kitchen
- Approximate timeline: 12 to 16 months
10 Marla house cost in Sahiwal: FAQs
How much does it cost to build a 10 Marla house in Sahiwal?
About PKR 1,22,75,790 for a fully finished single-storey house in 2026, with a likely range of PKR 1,12,08,655 to PKR 1,33,42,924.
What is the grey structure cost of a 10 Marla house in Sahiwal?
Around PKR 73,03,388 at 2026 rates. This covers the building shell and grey-stage labour, not finishing.
How much more does a double-storey 10 Marla house cost in Sahiwal?
A fully finished double-storey house comes to about PKR 2,16,93,011, compared with PKR 1,22,75,790 for a single storey.
How much covered area does a 10 Marla plot give?
Roughly 2,250 sq ft, typically built as a single-storey home with 5 bedrooms, 5 bathrooms and 1 kitchen. A build of this size usually takes 12 to 16 months.
How easy is it to get materials and labour in Sahiwal?
Sahiwal is a smaller market, so material prices can vary more between dealers. Core items such as cement, steel and bricks are available locally, but some finishing materials may need to be sourced from Lahore or Faisalabad. Labour is the most affordable of the cities covered here, though the pool of highly specialised finishing contractors is smaller than in Lahore.