5 Marla house construction cost in Karachi (2026)
Building a 5 Marla house in Karachi in 2026 costs about PKR 76,30,712 fully finished, based on current market rates. A 5 Marla plot gives roughly 1,125 sq ft of covered area, typically built as a single-storey home with 3 bedrooms, 3 bathrooms and 1 kitchen, and usually takes 8 to 12 months to complete. Karachi is usually the most expensive city in Pakistan to build in. High labour rates, logistics and the cost of moving materials across a very large city all add to the final figure. The likely range for a fully finished 5 Marla house in Karachi is PKR 69,36,279 to PKR 83,25,144, or about PKR 6,783 per sq ft.
At PKR 6,783 per sq ft, a fully finished 5 Marla house in Karachi works out to about PKR 76,30,712 in total.
Assumes 3 bedrooms, 3 bathrooms, 1 kitchen and market-grade materials.
Cost of a 5 Marla house in Karachi by stage
| Stage | Estimate | Likely range | Per sq ft |
|---|---|---|---|
| Grey structure | PKR 44,00,983 (44 Lakh) | 41.7 Lakh – 46.3 Lakh | PKR 3,912 |
| Semi-finished | PKR 57,82,468 (57.8 Lakh) | 53.6 Lakh – 62 Lakh | PKR 5,140 |
| Fully finished | PKR 76,30,712 (76.3 Lakh) | 69.4 Lakh – 83.3 Lakh | PKR 6,783 |
| Fully finished, double storey | PKR 1,31,36,223 (1.31 Crore) | 1.2 Crore – 1.43 Crore | PKR 5,838 |
Where the money goes (fully finished)
- Grey structurePKR 39,48,461 (52%)
- Boundary wall and gatePKR 5,53,222 (7%)
- Finishing workPKR 31,29,029 (41%)
| Item | Cost | Share |
|---|---|---|
| Steel (Sariya) | 11,36,320 | 14.9% |
| Grey Labour | 10,28,956 | 13.5% |
| Cement | 8,55,950 | 11.2% |
| Bricks (Eent) | 6,08,175 | 8% |
| Wood Doors | 5,78,760 | 7.6% |
| Plumbing | 4,96,875 | 6.5% |
| Boundary Wall | 4,52,522 | 5.9% |
| Electrical | 3,97,500 | 5.2% |
5 Marla house cost in Karachi: 2021 to 2031
| Year | Fully finished cost | Basis |
|---|---|---|
| 2021 | 32.5 Lakh | Market rates |
| 2022 | 44.2 Lakh | Market rates |
| 2023 | 56.6 Lakh | Market rates |
| 2024 | 62.8 Lakh | Market rates |
| 2025 | 69.5 Lakh | Market rates |
| 2026 | 76.3 Lakh | Market rates |
| 2027 | 85.4 Lakh | Forecast |
| 2028 | 95.7 Lakh | Forecast |
| 2029 | 1.08 Crore | Forecast |
| 2030 | 1.21 Crore | Forecast |
| 2031 | 1.36 Crore | Forecast |
Years marked forecast are projected from recent price growth.
Change the details
Adjust floors, bedrooms, quality or items to see your own number.
Calculating…
—
Building in Karachi: local notes
Karachi is a major import and distribution hub, so steel and cement are widely available, but transport and handling costs push delivered prices up. Sand and crush often have to be trucked in from outside the city, which adds to the bill.
Labour is plentiful in Karachi but rates are typically among the highest in Pakistan because of the city's size and cost of living.
TODO: add verified information
About a 5 Marla plot
5 marla is the most popular plot size in Pakistan. It is large enough for a comfortable family home and is the size most builders and contractors are most familiar with.
- Covered area: about 1,125 sq ft
- Typical layout: a single-storey home with 3 bedrooms, 3 bathrooms and 1 kitchen
- Approximate timeline: 8 to 12 months
5 Marla house cost in Karachi: FAQs
How much does it cost to build a 5 Marla house in Karachi?
About PKR 76,30,712 for a fully finished single-storey house in 2026, with a likely range of PKR 69,36,279 to PKR 83,25,144.
What is the grey structure cost of a 5 Marla house in Karachi?
Around PKR 44,00,983 at 2026 rates. This covers the building shell and grey-stage labour, not finishing.
How much more does a double-storey 5 Marla house cost in Karachi?
A fully finished double-storey house comes to about PKR 1,31,36,223, compared with PKR 76,30,712 for a single storey.
How much covered area does a 5 Marla plot give?
Roughly 1,125 sq ft, typically built as a single-storey home with 3 bedrooms, 3 bathrooms and 1 kitchen. A build of this size usually takes 8 to 12 months.
How easy is it to get materials and labour in Karachi?
Karachi is a major import and distribution hub, so steel and cement are widely available, but transport and handling costs push delivered prices up. Sand and crush often have to be trucked in from outside the city, which adds to the bill. Labour is plentiful in Karachi but rates are typically among the highest in Pakistan because of the city's size and cost of living.