10 Marla house construction cost in Karachi (2026)
Building a 10 Marla house in Karachi in 2026 costs about PKR 1,41,38,844 fully finished, based on current market rates. A 10 Marla plot gives roughly 2,250 sq ft of covered area, typically built as a single-storey home with 5 bedrooms, 5 bathrooms and 1 kitchen, and usually takes 12 to 16 months to complete. Karachi is usually the most expensive city in Pakistan to build in. High labour rates, logistics and the cost of moving materials across a very large city all add to the final figure. The likely range for a fully finished 10 Marla house in Karachi is PKR 1,29,09,569 to PKR 1,53,68,119, or about PKR 6,284 per sq ft.
At PKR 6,284 per sq ft, a fully finished 10 Marla house in Karachi works out to about PKR 1,41,38,844 in total.
Assumes 5 bedrooms, 5 bathrooms, 1 kitchen and market-grade materials.
Cost of a 10 Marla house in Karachi by stage
| Stage | Estimate | Likely range | Per sq ft |
|---|---|---|---|
| Grey structure | PKR 84,95,058 (85 Lakh) | 80.6 Lakh – 89.3 Lakh | PKR 3,776 |
| Semi-finished | PKR 1,09,62,659 (1.1 Crore) | 1.02 Crore – 1.17 Crore | PKR 4,872 |
| Fully finished | PKR 1,41,38,844 (1.41 Crore) | 1.29 Crore – 1.54 Crore | PKR 6,284 |
| Fully finished, double storey | PKR 2,50,41,231 (2.5 Crore) | 2.29 Crore – 2.71 Crore | PKR 5,565 |
Where the money goes (fully finished)
- Grey structurePKR 78,55,096 (56%)
- Boundary wall and gatePKR 7,40,663 (5%)
- Finishing workPKR 55,43,086 (39%)
| Item | Cost | Share |
|---|---|---|
| Steel (Sariya) | 22,72,640 | 16.1% |
| Grey Labour | 20,16,086 | 14.3% |
| Cement | 17,11,900 | 12.1% |
| Bricks (Eent) | 12,16,350 | 8.6% |
| Plumbing | 8,94,375 | 6.3% |
| Electrical | 7,95,000 | 5.6% |
| Tiles + Fixing | 7,92,034 | 5.6% |
| Wood Doors | 7,71,680 | 5.5% |
10 Marla house cost in Karachi: 2021 to 2031
| Year | Fully finished cost | Basis |
|---|---|---|
| 2021 | 60.3 Lakh | Market rates |
| 2022 | 81.9 Lakh | Market rates |
| 2023 | 1.05 Crore | Market rates |
| 2024 | 1.16 Crore | Market rates |
| 2025 | 1.29 Crore | Market rates |
| 2026 | 1.41 Crore | Market rates |
| 2027 | 1.58 Crore | Forecast |
| 2028 | 1.77 Crore | Forecast |
| 2029 | 1.99 Crore | Forecast |
| 2030 | 2.24 Crore | Forecast |
| 2031 | 2.53 Crore | Forecast |
Years marked forecast are projected from recent price growth.
Change the details
Adjust floors, bedrooms, quality or items to see your own number.
Calculating…
—
Building in Karachi: local notes
Karachi is a major import and distribution hub, so steel and cement are widely available, but transport and handling costs push delivered prices up. Sand and crush often have to be trucked in from outside the city, which adds to the bill.
Labour is plentiful in Karachi but rates are typically among the highest in Pakistan because of the city's size and cost of living.
TODO: add verified information
About a 10 Marla plot
10 marla is a common size for larger family homes. Many owners build a double storey on this plot, which roughly doubles the covered area and the cost.
- Covered area: about 2,250 sq ft
- Typical layout: a single-storey home with 5 bedrooms, 5 bathrooms and 1 kitchen
- Approximate timeline: 12 to 16 months
10 Marla house cost in Karachi: FAQs
How much does it cost to build a 10 Marla house in Karachi?
About PKR 1,41,38,844 for a fully finished single-storey house in 2026, with a likely range of PKR 1,29,09,569 to PKR 1,53,68,119.
What is the grey structure cost of a 10 Marla house in Karachi?
Around PKR 84,95,058 at 2026 rates. This covers the building shell and grey-stage labour, not finishing.
How much more does a double-storey 10 Marla house cost in Karachi?
A fully finished double-storey house comes to about PKR 2,50,41,231, compared with PKR 1,41,38,844 for a single storey.
How much covered area does a 10 Marla plot give?
Roughly 2,250 sq ft, typically built as a single-storey home with 5 bedrooms, 5 bathrooms and 1 kitchen. A build of this size usually takes 12 to 16 months.
How easy is it to get materials and labour in Karachi?
Karachi is a major import and distribution hub, so steel and cement are widely available, but transport and handling costs push delivered prices up. Sand and crush often have to be trucked in from outside the city, which adds to the bill. Labour is plentiful in Karachi but rates are typically among the highest in Pakistan because of the city's size and cost of living.